Volvo Site Simulation
Optimum fleet configuration
- Perform mixed fleet comparisons
- Determine the right Volvo equipment for the project at hand
- Consider factors such as machine size, quantity, fleet configuration and attachments
The best haul route
- Get advice on the optimum site configuration
- Consider multiple factors such as payload, travel gradients and travel distance
Get set-up for profitability
Powerful projections
- On-screen animations and simple written reports
- Projections on owning and operating costs
- Insight into the impact on overall costs
- Greater accuracy in planning, forecasts, budgets and bids
The right resources
- Visualize how operator performance will impact productivity
- Identify the optimum behaviors needed to maximize project efficiency
- Receive guidance on any specific actions or training required
Less fuel, less co₂
- Reduced fuel consumption
- Reduced carbon footprint and environmental impact
- Site reports include information on CO₂ emissions
Collect data
We work closely with you to gather data from your site. Jobsite-specific factors such as bank density, swell factor, average bucket fill percentage and ground conditions are entered into the tool. It is also possible to scan your site with a GPS device or drone.
Run the simulation
Once key factors have been collected, the simulation is run.
Analyze and advise
Compare, review and recommend the best solution for your site.